Our skyline is dramatically changing; we are out of the ground and into the air!

  • To date we have installed over 275 modules; 5 major Stacks, the Vacuum Tower in Unit 20; and all 17 PEB’s!
  • We currently have 96 cranes on site supporting the project.
  • Mammoet configured the Liebherr LR 11350 crawler crane with the ‘P’ boom for installing the Fractionator 13-VE-304 in Unit 30 on December 7, 2015